By using properspursy.com services you agree to our Cookies Use and Data Transfer outside the EU.
We and our partners operate globally and use cookies, including for analytics, personalisation, ads and Newsletters.

  • Love the Shirt - Tottenham Forum

    Join one of the best Tottenham Hotspur Supporters forums on the interweb, Discuss the ins and outs of our great club with like minded spurs fans from around the world. Please note, if you are easily offended, this forum is not for you.


    Join us!

New Spurs stadium

Glenjamin

Glenjamin

Moderator
Founding Member
Ah man, that sucks. I hope you still make the most of the trip.

Nah unfortunately not going to bother. I can't get to Wembley in time for the start of the game.

I do completely get where u are coming from by the way, but I know at this point they have been leading us on and I think it's unfair for someone like myself that needs to fly.
 
skiathospurs

skiathospurs

Well-Known Member
Founding Member
I like Cock anyway!!
DmuEo5hW0AAcq1a.jpg


https://www.football.london/tottenham-hotspur-fc/news/new-tottenham-stadium-golden-cockerel-15131615
Tottenham Hotspur will once again have a golden cockerel on the north London skyline as a newly created one will sit on top of their new stadium.


Spurs have created a bigger version of the iconic structure which stood upon the east stand at White Hart Lane. Another stood on the opposite west stand at the old ground.
Tottenham Hotspur will once again have a golden cockerel on the north London skyline as a newly created one will sit on top of their new stadium.

Spurs have created a bigger version of the iconic structure which stood upon the east stand at White Hart Lane. Another stood on the opposite west stand at the old ground.
"The story was the dents had been caused in the Blitz. But the truth was the damage was done by Gazza — with an air rifle. He tried to deny it but he’d been spotted."

The new cockerel is ready to be lifted on top of the club's new home.

"The cockerel has such a rich history, it tells its own story. It is an honour to preserve that history and pay homage to the original artists who created it," said Arthur Steward from London Mould Makers.


“Many of our employees working on this project are Tottenham residents, so we are all well aware of the huge benefits this stadium regeneration scheme will bring to the local area."
 
Don Diaz

Don Diaz

Zero tolerance of Numpty's
Founding Member
Don't shoot me but I'm not sure we need it. The new WHL is new that's the point. The Old cockerels and clock are in the Club offices, so as long as they are preserved good enough I reckon.
 
skiathospurs

skiathospurs

Well-Known Member
Founding Member
Don't shoot me but I'm not sure we need it. The new WHL is new that's the point. The Old cockerels and clock are in the Club offices, so as long as they are preserved good enough I reckon.
And to have some sense of scale the new ones have to be bigger.
 
Motspur Hotspur

Motspur Hotspur

Well-Known Member
NO, NO and thrice NO!
I want to see a huge cock be erected, in fact I DEMAND IT!
:p
 
Yid

Yid

Moderator
Founding Member
It "might" look daft...

Why ain't we selling the top for naming rights for Ariel views...?

I'm kinda with you @Don Diaz. Keep it sleek and modern... not that I give a fuck as I can never afford to go now its compulsory to donate a fucking organ to get through the turnstile.
 
Sneeky

Sneeky

Moderator
Founding Member
Each strip will be able to produce a coloured wash but no logos. They will be able to control them individually so they will be able to chase the colours round the roof, produce graduated colour, or multiple strips of different colours.

Each fitting is has red green and blue LEDs which can be individually adjusted using a control protocol called DMX. This means that each colour can be adjusted in intensity in 256 steps from off to full (assuming they are 8 bit, if they are 16bit then you have 65,656 steps). This means that you have the possibility to produce 16,777,216 different colours. (Or waaaay more than that if they are 16bit.)

Of course in truth that means some changes will be imperceptible so the best way of thinking about them is that they should be able to produce pretty much any colour within the limits of the spectrum that each LED produces
 
Last edited:
BrooklynYid

BrooklynYid

Well-Known Member
Each strip will be able to produce a coloured wash but no logos. They will be able to control them individually so they will be able to chase the colours round the roof, produce graduated colour, or multiple strips of different colours.

Each fitting is has red green and blue LEDs which can be individually adjusted using a control protocol called DMX. This means that each colour can be adjusted in intensity in 256 steps from off to full (assuming they are 8 bit, if they are 16bit then you have 65,656 steps). This means that you have the possibility to produce 16,777,216 different colours. (Or waaaay more than that if they are 16bit.)

Of course in truth that means some changes will be imperceptible so the best way of thinking about them is that they should be able to produce pretty much any colour within the limits of the spectrum that each LED produces

Jeez, with all that you'd think they'd be able to make the damn fire extinguishers work. Typical Levy!
 
Finchbee

Finchbee

Well-Known Member
1 crane gone and another being taken down, not sure what it means tho !!
 
skiathospurs

skiathospurs

Well-Known Member
Founding Member
1 crane gone and another being taken down, not sure what it means tho !!
two cranes less??

3 days time we should have played,no way was it going to be ready even though they could have laid the pitch,and done X amount of overtime,just no way it would have been ready for 62k people this saturday.


 
The Cryptkeeper

The Cryptkeeper

The Aussie Yid
So, what is the overwhelming sentiment Yids...are we in before Christmas or not?
 
C

corroded

Well-Known Member
Still going for Jan.

Based on no expertise, experience or knowledge.
 
Don Diaz

Don Diaz

Zero tolerance of Numpty's
Founding Member
I'm afraid that I've lost interest massively. Spent most of last season and all Summer, excitedly watching the build, learning about rakers and vomitories, how to raise a roof and all sorts of stuff, here and on Sky Scraper City......can't remember the last time I looked these days. No doubt will be excited when it's finally announced and we can believe in it.
 
skiathospurs

skiathospurs

Well-Known Member
Founding Member
Fllodlights on.

dSGAcwr.png


In response to @The Cryptkeeper I think it is in before xmas or not until next season.The deal with the fa is until mid december for wembley and rumour has it after that it is a take it or leave it deal until may.As for if we will move in??I guess yes,but its purely a guess.
 
BrooklynYid

BrooklynYid

Well-Known Member
Have to say that the exterior construction (the entrances, plazas, and walkways) looks WAY behind schedule. I can definitely see the stadium itself being ready by December, but have no idea how they would move 60,000 plus in and out of the stadium by that time. Squeaky bum time imo.
 
skiathospurs

skiathospurs

Well-Known Member
Founding Member
Have to say that the exterior construction (the entrances, plazas, and walkways) looks WAY behind schedule. I can definitely see the stadium itself being ready by December, but have no idea how they would move 60,000 plus in and out of the stadium by that time. Squeaky bum time imo.
It`s a proper unholy farce how even if we are just viewed as mere customers we have been treated and the lack of comms.It will impact the side,morale in the club does effect things on the pitch.Guess we know where the transfer budget went,set aside for rent.
 
Glenjamin

Glenjamin

Moderator
Founding Member
Couldn't give a monkeys anymore, Levy has arse raped the support and made us a joke, but I still reckon Man United. Anything around Christmas is risky and our games are shit from a big occasion perspective.
 
Don Diaz

Don Diaz

Zero tolerance of Numpty's
Founding Member
This is exactly the sort of time that Levy or someone from the board should be out front and answering these questions. It's not Poch's responsibilty, He'll be cleaning the bogs and checking the floodlights next. Levy needs to insert his backbone - he's supposed to be a fierce negotiator isn't he? and start being responsible when things go wrong. He's good at claiming credit for the training ground etc. the fuck ups are his fault as well.
 
skiathospurs

skiathospurs

Well-Known Member
Founding Member
This is exactly the sort of time that Levy or someone from the board should be out front and answering these questions. It's not Poch's responsibilty, He'll be cleaning the bogs and checking the floodlights next. Levy needs to insert his backbone - he's supposed to be a fierce negotiator isn't he? and start being responsible when things go wrong. He's good at claiming credit for the training ground etc. the fuck ups are his fault as well.
You know I still havent had a stadium update email from the club since pre-season,if i didnt do twitter I`d be none the wiser.Imagine buying something in May,told its coming august,then sept and now still dont know when,as a business its shocking to its customers,I am normally pretty happy clappy about THFC,but am dismayed at what is going on from the club.Not the stadium,mace,poch and the team but the board and their hiding from the issues,as you say,why is Poch front and centre talking about this and not Levy.
 
Don Diaz

Don Diaz

Zero tolerance of Numpty's
Founding Member
You know I still havent had a stadium update email from the club since pre-season,if i didnt do twitter I`d be none the wiser.Imagine buying something in May,told its coming august,then sept and now still dont know when,as a business its shocking to its customers,I am normally pretty happy clappy about THFC,but am dismayed at what is going on from the club.Not the stadium,mace,poch and the team but the board and their hiding from the issues,as you say,why is Poch front and centre talking about this and not Levy.
It's email to Jonathan Waites time methinks.....
 
Liam

Liam

Well-Known Member
Founding Member
Was chatting to a sparky in Greece whilst out on a stag do last night.He seems to think it'll be next season before it's finished. Said the main problem is they're trying to do it too fast and got different trades doing things in no order and fucking things up for other trades so jobs are getting done two or three times instead of once cos there's no communication between different contractors. Said it was the most chaotic site he'd ever worked on.
 
Top